RIX Asset Maintenance (RAM) were contracted by the John Holland CPB Ghella (JHCPBG) joint venture to stabilise a 20m high sandstone heritage wall
CASED DRILLING
CLIENT: SYDNEY METRO
LOCATION: BARANGAROO, NSW
DESIGN: TECHNICAL CASED DRILLING
The Sydney Metro is Australia's biggest public transport project and, when complete, it will deliver 31 metro stations and more than 66 kilometres of new metro rail, revolutionising the way Australia's biggest city travels.
RIX Asset Maintenance (RAM) was contracted by the John Holland CPB Ghella (JHCPBG) joint venture to stabilise a 20m high sandstone heritage wall at Barangaroo prior to JHCPBG excavating shafts to lower the Tunnel Boring Machines (TBM).
RAM completed the following:
The new permanent casing technique that RAM developed for the project enabled the works to be successfully completed with difficult access drilling equipment.
RAM successfully completed these drilling work using many different access techniques, these included drilling from/with: