The 2019 Flood event devastated the Townsville area and caused significant damage to the Queensland Highway network. Slope repair construction works were required in multiple locations.
CLIENT: Department of Transport and Main Rd
LOCATION: Hervey Range, QLD
COMPLETION: 2021
DESIGN: Debris Flow Barrier, Rope access, Rock bolts, Shotcrete, Mesh
.
Slope repair construction works to multiple locations for damages associated with the 2019 Flood event that devastated the Townsville area and caused significant damage to the Queensland Highway network. These works were approved under the Disaster Recovery Funding Arrangement (DRFA).
RAM were engaged through a sub-contract agreement through RMS to undertake the full scope of works.
This included:
RAM successfully completed these stabilisation works using many different construction techniques including the follow solutions.
This included: